Projects: Water
INTEGRAL SEWERAGE PLAN FOR THE GREATER BILBAO AREA. BLOCK 11
TECHNICAL ASSISTANCE TO THE WORKS MANAGEMENT OF THE INTEGRAL SEWERAGE PLAN FOR THE GREATER BILBAO AREA. BLOCK 11
Technical assistance for the Integral Sewerage Plan of the Greater Bilbao Area
Area of activity
WATER AND ENVIRONMENT
Service
Sewerage and drainage systems
Client
CABB – Bilbao Bizkaia Water Consortium
Scope
- Technical assistance to site supervision
- Modified projects development
Duration
2011-2015
The purpose of this contract is the service (initially two years, 2011-2015) of technical assistance to the works management works of the Integral Sanitation Plan of the District of Greater Bilbao (Block 11). This assistance will complete the human and material resources of the Works Management integrated by technicians of the Bilbao Bizkaia Water Consortium (CABB), for the Management, Control and Surveillance of the execution of the sewerage construction works entrusted.
Among the most important works are the Arriandi Storm Tank, the Cotorrio Interceptor (Upper Section), the Alto Butrón Phase 2 Drainage. Fruiz and Lotina collectors and Phase 3. Arrieta collectors, the Armintza-Urizar collector, the new regulating tank in Abanto (La Esperanza), the extension of the Galindo odor treatment system and the collectors in Medio Butrón.
The scope of the works contained in the contracts is to collaborate with the Administration (CABB) in the Works Management, assisting the Works Manager in the performance of his duties. The scope of the works includes on-site work for control and supervision, as well as the provision of technical office support and material resources.