Projects: City and Territory

ITURRIGORRI AND GARDEAZABAL NEIGHBORHOODS URBANIZATION

URBANIZATION PROJECT OF THE U.E. 740.01 OF THE A.R. 740 (EL PEÑASCAL) OF THE GENERAL MODIFICATION OF BILBAO IN THE A.R. 734 AND 739 IN THE WAY OF ITURRIGORRI FOR THE IMPLANTATION OF RESIDENTIAL BLOCKS.

Detailed study of the E.U. 740.01 of the A.R. 740 (el peñascal) of the general modification of bilbao in the EA.R. 734 and 739 in the way of iturrigorri for the implantation of residential blocks.
P.E.O.U. of the U.E. 740.01 of the A.R. 740 (el peñascal) of the modif. of the P.G. of bilbao in the A.R. 734 and 739 in the way of iturrigorri for the implantation of residential blocks.

Execution of 85 housing units and environmental recovery

Area of activity
CITY AND TERRITORY

Service
Urban and territorial development

Client
Basque Government

Scope

  • Urban Development Action Program (PAU) development
  • Urbanization project
  • Housing demolition projects

Duration
2013-2017

The purpose of this contract is the developing of the urban planning documents that will allow the urbanization of the E.U. 734.01 to be carried out. The demolition of all the existing buildings is foreseen, as they lack basic habitability standards and have been declared out of order, and the construction of 85 new dwellings for which all the necessary urban services have been planned.

In the Gardeazabal Area, once the 63 existing homes have been demolished, the existing hillside will be recovered, with revegetation and environmental recovery actions.

In the Iturrigorri Area, after the demolition of the 37 existing dwellings, it is foreseen the execution, according to the planning of the P.G.O.U. of Bilbao, of a single block of 85 x 15 m, with first floor +5, which will house the future 85 projected dwellings.

The Urbanization Project will establish the alignments and gradients of the building blocks, readjusting them to those foreseen in the planning and based on the conditions of the land and the urbanization to be considered. It will be adjusted at all times to the provisions of the Modification of the General Plan of these Execution Units.

The defined works include the execution of the earthworks necessary to achieve the platform to be urbanized, the stabilization of the slope and the drainage networks necessary for the preparation of the area.

Likewise, all the necessary service connections for the new dwellings are planned, as well as the external urbanization works (sidewalk paving, lighting, street furniture, etc.).

ITURRIGORRI AND GARDEAZABAL NEIGHBORHOODS URBANIZATION - 1
ITURRIGORRI AND GARDEAZABAL NEIGHBORHOODS URBANIZATION - 2
ITURRIGORRI AND GARDEAZABAL NEIGHBORHOODS URBANIZATION - 3
ITURRIGORRI AND GARDEAZABAL NEIGHBORHOODS URBANIZATION - 4

This website uses cookies to track visitors to the website, to improve performance and user experience.
By continuing to browse the site you are agreeing to our use of cookies. Cookies Policy
Accept | Reject