SERVICE FOR THE UPDATING PROJECT OF THE TRACK MODERNIZATION PC OF MENDARO STATION AND ELIMINATION OF LEVEL CROSSINGS BETWEEN PLATFORMS.

Mendaro train station and rail upgrading and level crossing removal

Area of activity
TRANSPORT INFRASTRUCTURES

Service
Railways, subway and LRT

Client
ETS – Euskal Trenbide Sarea

Scope

  • Updating of the detailed design project

Duration
2020-2021

The railway lines operated by EuskoTren cover a total length of 186 km, made up of different types and ages of track, which require periodic updating according to their age and condition. The Mendaro station has an old generation of track equipment, consisting of 45 RN rail and wooden sleeper between PPKK 60+264 and 60+547 of the Euskotren line between Bilbao and Donostia.

The existing track material is 19 years old (installed in 1998). The current tracks are metric gauge and are equipped with 45 kg/m rail mounted on wooden sleepers with Vossloh fastening.

The current state of the sleepers, the fastenings, the track equipment and the type of equipment generate problems of over-width in curves, loss of track alignment during the summer season and loss of levelling at joints. In order to remedy these deficiencies, it was necessary to renew the track equipment and the elements linked to the railway platform.

With this in mind, the Mendaro station track modernization construction project and elimination of the level crossing between platforms was carried out. However, the modification of the initial conditions poses the need to adapt and update these works.

TRACK UPDATING IN MENDARO AND REMOVAL OF LEVEL CROSSING - 1
TRACK UPDATING IN MENDARO AND REMOVAL OF LEVEL CROSSING - 2
TRACK UPDATING IN MENDARO AND REMOVAL OF LEVEL CROSSING - 3
TRACK UPDATING IN MENDARO AND REMOVAL OF LEVEL CROSSING - 4
TRACK UPDATING IN MENDARO AND REMOVAL OF LEVEL CROSSING - 5
TRACK UPDATING IN MENDARO AND REMOVAL OF LEVEL CROSSING - 6
TRACK UPDATING IN MENDARO AND REMOVAL OF LEVEL CROSSING - 7
TRACK UPDATING IN MENDARO AND REMOVAL OF LEVEL CROSSING - 8

This website uses cookies to track visitors to the website, to improve performance and user experience.
By continuing to browse the site you are agreeing to our use of cookies. Cookies Policy
Accept | Reject