URIBITARTE PROMENADE IN THE BILBAO ESTUARY
PRELIMINARY PROJECTS FOR THE TENDER OF THE CITY COUNCIL OF BILBAO FOR THE REPAIR AND RECONSTRUCTION OF THE RIA’S DOCKS.
CONSTRUCTION PROJECT FOR THE REPAIR AND RECONSTRUCTION OF THE BILBAO ESTUARY WHARF IN PASEO URIBITARTE.
Constructive definition for actions in the Uribitarte area
Area of activity
CITY AND TERRITORY
Service
UTE Uribitarte (Bilbao City Council)
Client
Urban and landscape design
Scope
- Drafting of the preliminary project
- Drafting of the construction project
Duration
2011-2012
Over the years there have been several landslides in various sections of the docks of the Bilbao Estuary, in its stretch through the municipality of Bilbao. The institutions involved decided to carry out a diagnosis of the real situation of the walls and structures on the banks of the estuary. As a result of this study, commissioned by the Ministry of the Environment and Rural and Marine Affairs, the Bilbao City Council and the Port Authority of Bilbao determined the most urgent areas for action, as well as the solutions that could be proposed for each area.
For the most immediate actions, two files were tendered by the Bilbao City Council, the first one covering actions between Urazurrutia and the City Hall, and the second one containing actions in the Uribitarte docks.
The object of the present project includes the constructive definition for the actions in the second area of Uribitarte, consisting of different typologies depending on whether the actions are carried out on the structures of the piers, demolishing the entire existing structure or only acting on the upper slab.
The pier consists of a concrete structure supported on prefabricated and driven piles built around 1925. According to the requirements, the proposal is developed consisting in the construction of a new pier by means of successive gantries.